PSA – Judd Creek Bridge Project

March 6th, 2021 by VoV

The three-week-long project requires a full, around-the-clock closure of Vashon Highway between SW Burton Drive and SW 204th Street. Local access will be maintained throughout construction. More details and a detour map is located on the Judd Creek Bridge Project website.

  • The road is closed to through traffic from SW 204th Street to SW Burton Drive.
  • Access to businesses and homes will be maintained throughout construction.
  • Local access is possible from the north or south. Travelers PSA – Judd Creek Bridge Project may NOT use the bridge toget over Judd Creek.
  • Due to the narrow work zone, no pedestriansor bicyclists may use the bridge at any time during the 23-day closure.

The detour will add an extra five minutes tothe typical trip.

Package deliveries, US Mail and waste collection will be maintained throughout construction, though deliveries and mail may be out of sequence.
Delivery drivers must enter the local access zone from the north or the south and may NOT use Judd Creek Bridge to connect across the creek.